Two drilling crew members in high-visibility jackets and hard hats handle drill rods beside a rig at Aberdeen Minerals’ Arthrath project, the feedstock source for UK nickel and cobalt supply.

Arthrath’s sulphide concentrates are where CASCADE’s route to UK nickel and cobalt supply begins

(Image courtesy of Aberdeen Minerals)

ReOre Technologies will lead a two-year, £1.4m project to recover nickel, cobalt and copper from sulphide concentrates sourced in Aberdeenshire, using a process that runs at ambient pressure and low temperature. The CASCADE project connects a Scottish deposit, a new hydrometallurgical route and a product validation step for the battery supply chain, which gives buyers and engineers following UK nickel and cobalt supply a defined programme to follow.

The funding comes from the UK government’s Battery Innovation Programme, which Innovate UK delivers on behalf of the Department for Business, Innovation, Science and Trade. ReOre, an Altilium group company, leads alongside Aberdeen Minerals, whose Arthrath project supplies the feedstock, and Camborne School of Mines, which will carry out sample characterisation and testwork at its Cornwall laboratories, including the Critical Minerals Equipment Hub that opened with more than £3.5m of government funding. Altilium will also validate the recovered nickel and cobalt and assess how well they suit the UK battery materials supply chain.

Processing Scottish concentrates into UK nickel and cobalt supply

Aberdeen Minerals describes Arthrath in Aberdeenshire as the largest known nickel deposit in the UK. The usual route for sulphide deposits like Arthrath is to sell concentrate from the mine site onward to a smelter, a stage Aberdeen Minerals invited innovators to address this spring in a call for novel processing methods aimed at accelerating development at the project. ReOre’s announcement adds that the UK currently has no primary extraction of nickel and cobalt and lacks the processing capability to turn them into products for the battery supply chain.

ReOre’s patent-pending EcoMineral process is hydrometallurgical and uses a biodegradable, non-toxic chemistry at ambient pressure and low temperatures, which ReOre says may lower energy use, environmental impact and processing costs. The process can also handle end-of-life products and mine waste, and Camborne School of Mines will lead the waste-stream strand of the project alongside its sample testing.

Demand and policy behind UK nickel and cobalt supply

UK EV production will need about 38,000 tonnes of nickel and 4,900 tonnes of cobalt a year by 2035, according to Advanced Propulsion Centre projections cited in ReOre’s announcement. ReOre positions CASCADE as support for the UK Critical Minerals Strategy, known as Vision 2035, which targets at least 10% of annual demand from domestic production and 20% from recycling by that year. Toby French, ReOre’s business lead, says responsible domestic primary resources alongside recycling will be essential for the UK.

A pathway from laboratory to pilot for domestic nickel and cobalt

Aberdeen Minerals chief executive Fraser Gardiner welcomed the partnership and the grant, and Camborne School of Mines’ Dr Rich Crane, Associate Professor of Sustainable Mining, said securing the UK’s untapped mineral resources takes more than finding new deposits. He described CASCADE as a step toward more resilient and sustainable mineral supply chains.

Over the two years, CASCADE is intended to establish a pathway for phased scale-up from laboratory to pilot stage, while Altilium’s validation work assesses how well the recovered nickel and cobalt suit the UK battery materials supply chain.

Stay ahead in the electrification revolution. Explore more breakthroughs from leading innovators in electric commercial transport – visit our news page.